<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Mercier Bridge &#187; Work progress</title>
	<atom:link href="http://pontmercierbridge.ca/eng/category/work-progress/feed/" rel="self" type="application/rss+xml" />
	<link>http://pontmercierbridge.ca/eng</link>
	<description></description>
	<lastBuildDate>Fri, 27 Jan 2012 22:59:11 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=</generator>
		<item>
		<title>Message from the MTQ : Closure of the Honoré-Mercier Bridge Upstream this week-end, January 28 &amp; 29</title>
		<link>http://pontmercierbridge.ca/eng/2012/01/message-from-the-mtq-closure-of-the-honore-mercier-bridge-upstream-this-week-end-january-28-29/</link>
		<comments>http://pontmercierbridge.ca/eng/2012/01/message-from-the-mtq-closure-of-the-honore-mercier-bridge-upstream-this-week-end-january-28-29/#comments</comments>
		<pubDate>Fri, 27 Jan 2012 22:39:40 +0000</pubDate>
		<dc:creator>André Girard</dc:creator>
				<category><![CDATA[Closures and detours]]></category>
		<category><![CDATA[Ministère des Transports Work]]></category>
		<category><![CDATA[Work progress]]></category>

		<guid isPermaLink="false">http://pontmercierbridge.ca/eng/?p=1229</guid>
		<description><![CDATA[The ministère des Transports wishes to inform road users that the Honoré-Mercier Bridge upstream will be closed to traffic, between Friday, January 27th, 10 AM, and Monday, January 30th, 5 AM. During this period, traffic management will follow this schedule: Friday January 27th, 10 AM, to Saturday, January 28th, 4 AM Two lanes will be [...]]]></description>
			<content:encoded><![CDATA[<p>The <strong>ministère des Transports</strong> wishes to inform road users that the Honoré-Mercier Bridge upstream will be closed to traffic, between Friday, January 27<sup>th</sup>, 10 AM, and Monday, January 30<sup>th</sup>, 5 AM.</p>
<p>During this period, traffic management will follow this schedule:</p>
<table border="1" cellspacing="0" cellpadding="0">
<tbody>
<tr>
<td valign="top" width="283">Friday January 27th, 10 AM, to Saturday, January 28th, 4 AM</td>
<td valign="top" width="276">Two lanes will be opened to traffic towards the <strong>South</strong><strong> Shore</strong>. No traffic towards Montréal.</td>
</tr>
<tr>
<td valign="top" width="283">Saturday, January 28th, from 5 AM to 2 PM</td>
<td valign="top" width="276">Two lanes will be opened to traffic towards <strong>Montréal</strong>. No traffic towards the South Shore.</td>
</tr>
<tr>
<td valign="top" width="283">Saturday, January 28th, 3 PM, to Sunday, January 29th, 4 AM</td>
<td valign="top" width="276">Two lanes will be opened to traffic towards the <strong>South</strong><strong> Shore</strong>. No traffic towards Montréal.</td>
</tr>
<tr>
<td valign="top" width="283">Sunday, January 29th,from 5 AM, to 2 PM</td>
<td valign="top" width="276">Two lanes will be opened to traffic towards <strong>Montréa</strong>l. No traffic towards the South Shore.</td>
</tr>
<tr>
<td valign="top" width="283">Sunday, January 29th, 3 PM, to Monday, January 30th, 5 AM</td>
<td valign="top" width="276">Two lanes will be opened to traffic towards the <strong>South</strong><strong> Shore</strong>. No traffic towards Montréal.</td>
</tr>
<tr>
<td valign="top" width="283">Monday, January 30th, 5 AM</td>
<td valign="top" width="276">Reopening of the upstream bridge. Two lanes will be opened in each direction.</td>
</tr>
</tbody>
</table>
<p>This closure is required to perform to repair work at the structural elements, under the bridge.</p>
<p>Before each trip, find out about road work by visiting <strong><span style="text-decoration: underline;"><a title="http://www.quebec511.gouv.qc.ca/" href="http://www.quebec511.gouv.qc.ca/">www.quebec511.info</a></span></strong> to help you plan your travels.</p>
]]></content:encoded>
			<wfw:commentRss>http://pontmercierbridge.ca/eng/2012/01/message-from-the-mtq-closure-of-the-honore-mercier-bridge-upstream-this-week-end-january-28-29/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Honoré Mercier Bridge – Closure of the La Prairie Ramp towards Montreal on Thursday December 22 from 1 PM to 5 PM</title>
		<link>http://pontmercierbridge.ca/eng/2011/12/honore-mercier-bridge-%e2%80%93-closure-of-the-la-prairie-ramp-towards-montreal-on-thursday-december-22-from-1-pm-to-5-pm/</link>
		<comments>http://pontmercierbridge.ca/eng/2011/12/honore-mercier-bridge-%e2%80%93-closure-of-the-la-prairie-ramp-towards-montreal-on-thursday-december-22-from-1-pm-to-5-pm/#comments</comments>
		<pubDate>Wed, 21 Dec 2011 18:55:34 +0000</pubDate>
		<dc:creator>André Girard</dc:creator>
				<category><![CDATA[Closures and detours]]></category>
		<category><![CDATA[Update]]></category>
		<category><![CDATA[Work progress]]></category>

		<guid isPermaLink="false">http://pontmercierbridge.ca/eng/?p=1214</guid>
		<description><![CDATA[We wish to inform you that the La Prairie Ramp (Ramp 2) will be completely closed to traffic towards Montreal on Thursday, December 22, from 1 PM to 5 PM. The Exit towards La Prairie of that same Ramp will be opened during the work. During this period, motorists will be asked to take a [...]]]></description>
			<content:encoded><![CDATA[<p>We wish to inform you that the <strong>La Prairie Ramp (Ramp 2)</strong> will be completely closed to traffic <strong>towards Montreal</strong> on Thursday, December 22, from 1 PM to 5 PM. The Exit towards La Prairie of that same Ramp will be opened during the work.</p>
<p>During this period, motorists will be asked to take a temporary detour route, which will lead them to Highway 207, then to Highway 138, to eventually access the bridge by the Chateauguay access ramp.</p>
<p>We invite you to view the following <a href="http://www.flickr.com/photos/pontmercierbridge/4977342051/in/photostream/lightbox/" target="_blank"><span style="text-decoration: underline;">map showing the detour route towards Montreal</span></a>:</p>
<p><a title="Chemin de déviation vers Montréal - Travaux de nuit sur la rampe 2 de Pont Mercier Bridge, sur Flickr" href="http://www.flickr.com/photos/pontmercierbridge/4977342051/"><img src="http://farm5.staticflickr.com/4104/4977342051_21fcddfd2b.jpg" alt="Chemin de déviation vers Montréal - Travaux de nuit sur la rampe 2" width="500" height="252" /></a></p>
<p>To enlarge the picture, <a href="http://www.flickr.com/photos/pontmercierbridge/4977342051/in/photostream/lightbox/" target="_blank"><span style="text-decoration: underline;">click here</span></a>.</p>
]]></content:encoded>
			<wfw:commentRss>http://pontmercierbridge.ca/eng/2011/12/honore-mercier-bridge-%e2%80%93-closure-of-the-la-prairie-ramp-towards-montreal-on-thursday-december-22-from-1-pm-to-5-pm/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Message from the MTQ : Honoré-Mercier Bridge : lane closure towards Montreal at night</title>
		<link>http://pontmercierbridge.ca/eng/2011/12/message-from-the-mtq-honore-mercier-bridge-lane-closure-towards-montreal/</link>
		<comments>http://pontmercierbridge.ca/eng/2011/12/message-from-the-mtq-honore-mercier-bridge-lane-closure-towards-montreal/#comments</comments>
		<pubDate>Tue, 06 Dec 2011 20:40:07 +0000</pubDate>
		<dc:creator>André Girard</dc:creator>
				<category><![CDATA[Closures and detours]]></category>
		<category><![CDATA[Ministère des Transports Work]]></category>
		<category><![CDATA[Update]]></category>
		<category><![CDATA[Work progress]]></category>

		<guid isPermaLink="false">http://pontmercierbridge.ca/eng/?p=1209</guid>
		<description><![CDATA[The ministère des Transports wishes to inform road users that inspection work will be performed on the Honoré-Mercier Bridge during two nights, first from 8 PM, Wednesday December 7th to 5 AM, Thursday December 8th and then from 8 PM,  Thursday December 8th to 5 AM, Friday December 9th. During this period, one of two [...]]]></description>
			<content:encoded><![CDATA[<p>The<strong> ministère des Transports</strong> wishes to inform road users that inspection work will be performed on the Honoré-Mercier Bridge during two nights, first from 8 PM, Wednesday December 7<sup>th</sup> to 5 AM, Thursday December 8<sup>th</sup> and then from 8 PM,  Thursday December 8<sup>th </sup>to 5 AM, Friday December 9<sup>th</sup>.</p>
<p>During this period, <strong>one of two eastbound lanes (towards Montreal)</strong> <span style="color: #ff0000;"><strong>will be closed</strong></span>.</p>
<p>Before each trip, find out about road work by visiting <a title="http://www.quebec511.gouv.qc.ca/" href="http://www.quebec511.gouv.qc.ca/">www.quebec511.gouv.qc.ca</a> to help you plan your travels. The Ministère des Transports also reminds you remain vigilant behind the wheel and obey the posted speed limits as you approach construction zones.</p>
]]></content:encoded>
			<wfw:commentRss>http://pontmercierbridge.ca/eng/2011/12/message-from-the-mtq-honore-mercier-bridge-lane-closure-towards-montreal/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Honoré-Mercier Bridge: A Single Lane Open in Each Direction on Saturday, November 19 From 6 AM to 6 PM</title>
		<link>http://pontmercierbridge.ca/eng/2011/11/honore-mercier-bridge-a-single-lane-open-in-each-direction-on-saturday-november-19-from-6-am-to-6-pm/</link>
		<comments>http://pontmercierbridge.ca/eng/2011/11/honore-mercier-bridge-a-single-lane-open-in-each-direction-on-saturday-november-19-from-6-am-to-6-pm/#comments</comments>
		<pubDate>Wed, 16 Nov 2011 18:41:59 +0000</pubDate>
		<dc:creator>André Girard</dc:creator>
				<category><![CDATA[Closures and detours]]></category>
		<category><![CDATA[Update]]></category>
		<category><![CDATA[Work progress]]></category>

		<guid isPermaLink="false">http://pontmercierbridge.ca/eng/?p=1202</guid>
		<description><![CDATA[We wish to inform you that traffic on the Honoré Mercier Bridge will be reduced to one lane in each direction (towards Montreal and towards the South Shore) during the day on Saturday, November 19 from 6 AM to 6 PM. Please note that Airlie ramp enabling access to the Honoré Mercier Bridge towards the [...]]]></description>
			<content:encoded><![CDATA[<p>We wish to inform you that traffic on the Honoré Mercier Bridge will be reduced to <span style="color: #ff0000;"><strong>one lane in each direction</strong></span> (towards Montreal and towards the South Shore) during the day on <strong>Saturday, November 19 from 6 AM to 6 PM</strong>.</p>
<p>Please note that <strong>Airlie ramp</strong> enabling access to the Honoré Mercier Bridge towards the South Shore from Airlie St. will also be closed during this period.</p>
<p>In case of bad weather, this obstruction to traffic will be rescheduled to Sunday from 6 AM to 6 PM.</p>
<p>The upstream bridge of the Honoré Mercier Bridge, namely the bridge that enables access to the South Shore (Route 138 West), will be completely closed to traffic during this period. Therefore, traffic will be reduced to one lane in each direction<strong>, </strong>with one being against the current of traffic, on the downstream bridge (Route 138 East).</p>
<p>These closures will allow the delivery of material underneath the bridge, within the context of Contract B, of the Honoré Mercier Bridge Rehabilitation Project.</p>
]]></content:encoded>
			<wfw:commentRss>http://pontmercierbridge.ca/eng/2011/11/honore-mercier-bridge-a-single-lane-open-in-each-direction-on-saturday-november-19-from-6-am-to-6-pm/feed/</wfw:commentRss>
		<slash:comments>1</slash:comments>
		</item>
		<item>
		<title>Message from the MTQ : Ouverture de la 4e voie de circulation sur le pont Honoré-Mercier</title>
		<link>http://pontmercierbridge.ca/eng/2011/11/message-from-the-mtq-ouverture-de-la-4e-voie-de-circulation-sur-le-pont-honore-mercier/</link>
		<comments>http://pontmercierbridge.ca/eng/2011/11/message-from-the-mtq-ouverture-de-la-4e-voie-de-circulation-sur-le-pont-honore-mercier/#comments</comments>
		<pubDate>Sun, 13 Nov 2011 22:55:31 +0000</pubDate>
		<dc:creator>André Girard</dc:creator>
				<category><![CDATA[Closures and detours]]></category>
		<category><![CDATA[Ministère des Transports Work]]></category>
		<category><![CDATA[Update]]></category>
		<category><![CDATA[Work progress]]></category>

		<guid isPermaLink="false">http://pontmercierbridge.ca/eng/?p=1200</guid>
		<description><![CDATA[Le ministre des Transports et député de Châteauguay, monsieur Pierre Moreau, annonce aujourd’hui la fin des travaux de renforcement des éléments d’acier sur le pont Honoré-Mercier, permettant ainsi la réouverture de la 4e voie de circulation, située sur la structure amont pour l’heure de pointe de lundi matin. À la mi-juin 2011, le Ministère procédait [...]]]></description>
			<content:encoded><![CDATA[<p>Le <strong>ministre des Transports</strong> et député de Châteauguay, monsieur Pierre Moreau, annonce aujourd’hui la fin des travaux de renforcement des éléments d’acier sur le pont Honoré-Mercier, permettant ainsi la réouverture de la<strong> 4<sup>e</sup> voie de circulation, située sur la structure amont pour l’heure de pointe de lundi matin.</strong></p>
<p>À la mi-juin 2011, le Ministère procédait à la fermeture de la structure amont du pont, après avoir été informé de récents résultats d’analyses, soulignant la dégradation des éléments d’acier qui nécessitaient une réparation majeure. Suite aux travaux et tel que prévu, le Ministère avait rouvert une voie du pont Honoré-Mercier amont le 6 septembre dernier, en permettant également la circulation des véhicules lourds.</p>
<p>« L’ouverture de la quatrième voie sur le pont Honoré-Mercier est un soulagement pour de nombreux usagers du secteur. La fluidité de la circulation, plus précisément en heures de pointe, sera améliorée, ce qui représente d’autant plus une économie en termes de temps et d’argent » a tenu à souligner Monsieur Moreau.</p>
<p>Le ministre a également tenu à remercier le comité de coordination qui avait été formé, au début de l’été, par les différents acteurs politiques et socio-économiques de la région pour leur travail et leur soutien tout au long des travaux.</p>
<p>Rappelons également qu’en parallèle, des travaux de réfection majeurs ont cours sur le pont Honoré-Mercier, en collaboration avec la société les Ponts Jacques Cartier, Champlain, Incorporée (PJCCI) et le Conseil Mohawk de Kahnawake (CMK). Il s’agit du plus grand projet de réfection jamais entrepris au Canada.</p>
]]></content:encoded>
			<wfw:commentRss>http://pontmercierbridge.ca/eng/2011/11/message-from-the-mtq-ouverture-de-la-4e-voie-de-circulation-sur-le-pont-honore-mercier/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Message from the MTQ : Traffic on the opposite direction on the Honoré-Mercier Bridge, Wednesday, November 2, from 9 AM to 3 PM</title>
		<link>http://pontmercierbridge.ca/eng/2011/11/message-from-the-mtq-traffic-on-the-opposite-direction-on-the-honore-mercier-bridge-wednesday-november-2-from-9-am-to-3-pm/</link>
		<comments>http://pontmercierbridge.ca/eng/2011/11/message-from-the-mtq-traffic-on-the-opposite-direction-on-the-honore-mercier-bridge-wednesday-november-2-from-9-am-to-3-pm/#comments</comments>
		<pubDate>Tue, 01 Nov 2011 15:12:44 +0000</pubDate>
		<dc:creator>André Girard</dc:creator>
				<category><![CDATA[Closures and detours]]></category>
		<category><![CDATA[Ministère des Transports Work]]></category>
		<category><![CDATA[Update]]></category>
		<category><![CDATA[Work progress]]></category>

		<guid isPermaLink="false">http://pontmercierbridge.ca/eng/?p=1195</guid>
		<description><![CDATA[The ministère des Transports wishes to inform road users that work at the steel elements will exceptionally cause the closure of the upstream bridge of the Honoré-Mercier Bridge on Wednesday, November 2nd, from 9 a.m. to 3 p.m. Therefore, traffic towards the South Shore will be transferred on the opposite direction (on the downstream bridge). One [...]]]></description>
			<content:encoded><![CDATA[<p>The <strong>ministère des Transports</strong> wishes to inform road users that work at the steel elements will exceptionally cause the closure of the upstream bridge of the Honoré-Mercier Bridge on <strong>Wednesday, November 2<sup>nd</sup>,<span style="color: #ff0000;"> from 9 a.m. to 3 p.m</span></strong>. Therefore, traffic towards the South  Shore will be transferred on the opposite direction (on the downstream bridge). <strong>One lane will be open in each direction.</strong></p>
<p>The Ministère is aware of the impacts which will have this closure to traffic, and thanks the population for its understanding.</p>
<p>Before each trip, find out about road work by visiting www.quebec511.info to help you plan your travels. The <strong>Ministère des Transports</strong> also reminds you remain vigilant behind the wheel and obey the posted speed limits as you approach construction zones.</p>
]]></content:encoded>
			<wfw:commentRss>http://pontmercierbridge.ca/eng/2011/11/message-from-the-mtq-traffic-on-the-opposite-direction-on-the-honore-mercier-bridge-wednesday-november-2-from-9-am-to-3-pm/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Message from the MTQ : Traffic on the opposite direction on the Honoré-Mercier Bridge</title>
		<link>http://pontmercierbridge.ca/eng/2011/10/message-from-the-mtq-traffic-on-the-opposite-direction-on-the-honore-mercier-bridge/</link>
		<comments>http://pontmercierbridge.ca/eng/2011/10/message-from-the-mtq-traffic-on-the-opposite-direction-on-the-honore-mercier-bridge/#comments</comments>
		<pubDate>Thu, 20 Oct 2011 17:27:43 +0000</pubDate>
		<dc:creator>André Girard</dc:creator>
				<category><![CDATA[Closures and detours]]></category>
		<category><![CDATA[Ministère des Transports Work]]></category>
		<category><![CDATA[Work progress]]></category>

		<guid isPermaLink="false">http://pontmercierbridge.ca/eng/?p=1191</guid>
		<description><![CDATA[The ministère des Transports wishes to inform road users that work at the steel elements will exceptionally cause the closure of the upstream bridge of the Honoré-Mercier Bridge. Please take note that between Friday, October 21st, 9 AM, and Monday, October 24th, 4 AM, traffic towards the South Shore will be transferred on the opposite direction (on [...]]]></description>
			<content:encoded><![CDATA[<p>The <strong>ministère des Transports</strong> wishes to inform road users that work at the steel elements will exceptionally cause the closure of the upstream bridge of the Honoré-Mercier  Bridge.</p>
<p>Please take note that between <span style="color: #ff0000;"><strong>Friday, October 21<sup>st</sup>, 9 AM, and Monday, October 24<sup>th</sup>, 4 AM</strong></span>, traffic towards the South Shore will be transferred on the opposite direction (on the downstream bridge). One lane will be open in each direction.</p>
<p>The Ministère is aware of the impacts which will have this closure to traffic, and thanks the population for its understanding.</p>
<p>Before each trip, find out about road work by visiting <a href="http://www.quebec511.info/">www.quebec511.info</a> to help you plan your travels. The Ministère des Transports also reminds you remain vigilant behind the wheel and obey the posted speed limits as you approach construction zones.</p>
]]></content:encoded>
			<wfw:commentRss>http://pontmercierbridge.ca/eng/2011/10/message-from-the-mtq-traffic-on-the-opposite-direction-on-the-honore-mercier-bridge/feed/</wfw:commentRss>
		<slash:comments>9</slash:comments>
		</item>
		<item>
		<title>Honoré-Mercier Bridge repairs &#8211; RECONSTRUCTION OF THE MONETTE VIADUCT: opening of a temporary viaduct to the South Shore</title>
		<link>http://pontmercierbridge.ca/eng/2011/09/honore-mercier-bridge-repairs-reconstruction-of-the-monette-viaduct-opening-of-a-temporary-viaduct-to-the-south-shore/</link>
		<comments>http://pontmercierbridge.ca/eng/2011/09/honore-mercier-bridge-repairs-reconstruction-of-the-monette-viaduct-opening-of-a-temporary-viaduct-to-the-south-shore/#comments</comments>
		<pubDate>Fri, 09 Sep 2011 21:14:14 +0000</pubDate>
		<dc:creator>André Girard</dc:creator>
				<category><![CDATA[Closures and detours]]></category>
		<category><![CDATA[Ministère des Transports Work]]></category>
		<category><![CDATA[Monette Viaduct]]></category>
		<category><![CDATA[Update]]></category>
		<category><![CDATA[Work progress]]></category>

		<guid isPermaLink="false">http://pontmercierbridge.ca/eng/?p=1178</guid>
		<description><![CDATA[We wish to announce the September 12 opening of a temporary viaduct to provide access to the Honoré-Mercier Bridge from the borough of LaSalle to the South Shore. The opening of this temporary viaduct will allow workers to demolish and rebuild the current Monette Viaduct over the next year. As part of the reconstruction of [...]]]></description>
			<content:encoded><![CDATA[<p>We wish to announce the <strong>September 12 opening</strong> of a <strong>temporary viaduct </strong>to provide access to the Honoré-Mercier Bridge from the borough of LaSalle to the South Shore. The opening of this temporary viaduct will allow workers to demolish and rebuild the current Monette Viaduct over the next year.</p>
<p>As part of the reconstruction of the Monette Viaduct, located at the northern approach to the bridge, the temporary viaduct will be an important means to <strong>alleviate inconveniences to motorists</strong> using the route. During the roadwork, traffic will detour over the viaduct in order to maintain the usual traffic flow to the South Shore while completely eliminating traffic on the Monette Viaduct.</p>
<p>Opening of the temporary viaduct <em>should not cause significant inconveniences to motorists</em> as the traffic will flow normally while permitting reconstruction of the northern approach to the Honoré-Mercier Bridge to the South Shore.</p>
<p><strong>Temporary Viaduct Location</strong></p>
<p><a title="Projet de reconstruction du viaduc Monette - situation du viaduc temporaire de Pont Mercier Bridge, sur Flickr" href="http://www.flickr.com/photos/pontmercierbridge/6130711399/in/photostream#/photos/pontmercierbridge/6130711399/in/photostream/lightbox/" target="_blank"><img src="http://farm7.static.flickr.com/6067/6130711399_29d2d0a4a7.jpg" alt="Projet de reconstruction du viaduc Monette - situation du viaduc temporaire" width="500" height="336" /></a></p>
<p><a href="http://www.flickr.com/photos/pontmercierbridge/6130711399/in/photostream#/photos/pontmercierbridge/6130711399/in/photostream/lightbox/" target="_blank"><span style="text-decoration: underline;"><em>Click on the map or here to enlarge.</em></span></a></p>
]]></content:encoded>
			<wfw:commentRss>http://pontmercierbridge.ca/eng/2011/09/honore-mercier-bridge-repairs-reconstruction-of-the-monette-viaduct-opening-of-a-temporary-viaduct-to-the-south-shore/feed/</wfw:commentRss>
		<slash:comments>1</slash:comments>
		</item>
		<item>
		<title>Message from MTQ : Honoré-Mercier Bridge reopened to westbound traffic</title>
		<link>http://pontmercierbridge.ca/eng/2011/09/message-du-mtq-reouverture-du-pont-honore-mercier-en-direction-ouest/</link>
		<comments>http://pontmercierbridge.ca/eng/2011/09/message-du-mtq-reouverture-du-pont-honore-mercier-en-direction-ouest/#comments</comments>
		<pubDate>Tue, 06 Sep 2011 12:45:31 +0000</pubDate>
		<dc:creator>André Girard</dc:creator>
				<category><![CDATA[Closures and detours]]></category>
		<category><![CDATA[Ministère des Transports Work]]></category>
		<category><![CDATA[Work progress]]></category>

		<guid isPermaLink="false">http://pontmercierbridge.ca/eng/?p=1171</guid>
		<description><![CDATA[Minister of Transport Sam Hamad announced today that the west side of the Honoré-Mercier Bridge will reopen, as scheduled, to westbound traffic travelling to the South Shore as of Tuesday, September 6, at 5:00 a.m. MTQ closed the west side of the bridge on June 14 after receiving a report stating that the steel structure was [...]]]></description>
			<content:encoded><![CDATA[<p>Minister of Transport Sam Hamad announced today that the west side of the Honoré-Mercier Bridge will reopen, as scheduled, to westbound traffic travelling to the South  Shore as of <strong>Tuesday, September 6</strong>, at 5:00 a.m.</p>
<p>MTQ closed the west side of the bridge on June 14 after receiving a report stating that the steel structure was badly deteriorated and 10 gusset plates needed major repairs. These gusset plates are part of the bridge’s basic structure.</p>
<p>Now that the urgent work is complete and has been approved by the project engineers, MTQ can reopen the bridge to traffic according to the following lane plan:</p>
<ul>
<li><strong>Two      lanes toward Montréal and one toward the South Shore</strong>
<ul>
<li>5 a.m. to 11:30 a.m., Monday to Friday</li>
</ul>
</li>
<li><strong>One lane      toward Montréal and two toward the South Shore</strong>
<ul>
<li>12:30 p.m. to 8 p.m., Monday to Wednesday</li>
<li>12:30 p.m. to 10 p.m., Thursday and Friday</li>
</ul>
</li>
<li><strong>One lane      in each direction</strong>
<ul>
<li>9 p.m. to 4 a.m.,       Monday to Wednesday</li>
<li>11 p.m. to 4 a.m.,       Thursday and Friday</li>
<li>Weekends and holidays</li>
</ul>
</li>
</ul>
<p>This plan also allows heavy vehicles to travel westbound on the bridge. Work to reinforce the steel structure will continue, and the second lane of traffic is scheduled to reopen by December 2011.</p>
<p>“As announced, MTQ will open the west side of the Honoré-Mercier Bridge on Tuesday, improving city traffic management just in time to meet heavy demand as summer vacation ends. This is great news for everyone using the bridge, including truck drivers, and a boost for the local economy,” stated Minister Hamad.</p>
<p>In late August, MTQ and its numerous partners introduced concrete measures to handle increased traffic in the Montréal area in anticipation of the start of the school year. These measures include opening the Champlain Bridge ice control structure to emergency vehicles and to empty buses travelling against traffic, adapting public transit services in response to demand, improving the coordination of roadwork, and enhancing communication with the public.</p>
<p>“These initiatives, which represent a total of $110 million in investments, are intended to minimize traffic congestion and cut travel time for thousands of people. All that combined with the reopening of the west side of the Honoré-Mercier  Bridge will make things much easier on drivers,” added Minister Hamad.</p>
<p>&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8211;</p>
<p><span style="color: #ff0000;"><strong>If you have questions or comments related to the MTQ lane closure or any other matter relating to these decisions, please visit <a href="http://www.mtq.gouv.qc.ca/portal/page/portal/accueil_en/joindre" target="_blank">their website</a></strong></span><strong>.</strong></p>
<p>** Please note that this blog has been created <strong>for the deck replacement project by </strong>The Jacques Cartier and Champlain Bridges Incorporated (JCCBI)<strong> and not for the operation and maintenance of the bridge by the MTQ.</strong> We just want to share the messages from the MTQ for the benefit of motorists.</p>
]]></content:encoded>
			<wfw:commentRss>http://pontmercierbridge.ca/eng/2011/09/message-du-mtq-reouverture-du-pont-honore-mercier-en-direction-ouest/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Important message from MTQ &#8211; Honoré-Mercier Bridge : modification to the access towards the South Shore for tonight</title>
		<link>http://pontmercierbridge.ca/eng/2011/09/important-message-from-mtq-honore-mercier-bridge-modification-to-the-access-towards-the-south-shore-for-tonight/</link>
		<comments>http://pontmercierbridge.ca/eng/2011/09/important-message-from-mtq-honore-mercier-bridge-modification-to-the-access-towards-the-south-shore-for-tonight/#comments</comments>
		<pubDate>Fri, 02 Sep 2011 17:07:14 +0000</pubDate>
		<dc:creator>André Girard</dc:creator>
				<category><![CDATA[Closures and detours]]></category>
		<category><![CDATA[Ministère des Transports Work]]></category>
		<category><![CDATA[Work progress]]></category>

		<guid isPermaLink="false">http://pontmercierbridge.ca/eng/?p=1166</guid>
		<description><![CDATA[The ministère des Transports wishes to inform road users that exceptionally for tonight peak period, access towards the South Shore, at the exit of the bridge, will be changed. Traffic will take place on the ramp 4, which generally allows traffic to route 138 East. Road users going towards route 138 West will simply have to [...]]]></description>
			<content:encoded><![CDATA[<p>The <strong>ministère des Transports</strong> wishes to inform road users that exceptionally for tonight peak period, access towards the South Shore, at the exit of the bridge, will be changed. Traffic will take place on the ramp 4, which generally allows traffic to route 138 East.</p>
<p>Road users going towards route 138 West will simply have to continue on their way. For those who want to reach route 132 East (to La Prairie) will have to continue on route 138, and then join route 207, to finally reach route 132. Signalization will be installed along the road.</p>
<p>This exceptional modification to the access is necessary to proceed to the installation of barriers, for the reopening of the Honoré-Mercier Bridge upstream.</p>
]]></content:encoded>
			<wfw:commentRss>http://pontmercierbridge.ca/eng/2011/09/important-message-from-mtq-honore-mercier-bridge-modification-to-the-access-towards-the-south-shore-for-tonight/feed/</wfw:commentRss>
		<slash:comments>4</slash:comments>
		</item>
	</channel>
</rss>

